Independent Electricity System Operator (IESO)

  • Status

    Operational

    Application

    Grid Services

    Size

    5 MW | 0.5 MWh

  • Technology

    Flywheel

    Interconnection Voltage

    13.8kV

Solution

This system provides second-by-second balancing frequency regulation services, supporting the grid’s operational reliability in the Greater Toronto Area.

Convergent's flywheel system provides balancing frequency regulation services, supporting the grid’s operational reliability in the Greater Toronto Area.