PJM

  • Status

    Operational

    Application

    Grid Balancing Services

    Size

    20 MW | 5 MWh

  • Technology

    Flywheel

    Interconnection Voltage

    69kV

Solution

This flywheel project provides second-by-second balancing frequency regulation services, supporting the Grid’s operational reliability in the Mid-Atlantic region.